OFPC Project No. 703-039 M.D. ANDERSON CANCER CENTER
Ambulatory Clinical Building
55050.00
AV BID AUDIO VISUAL SYSTEM
03/11/04 11738 -27
F. Other Tests - Perform any other tests on any piece of equipment or audio system as requested by
Consultant.
G. Final Equipment Settings – Record final settings of all equalizer bands, tone controls, filters, delays,
limiters, etc., including those established through computer software settings. Include descriptions of
settings (including software settings) in Operation and Maintenance Manual. Include software copy of
configuration file(s) in Operation and Maintenance Manual.
H. Security Inspection – Inspect equipment for security from tampering (covers, shaft-locks, etc.).
I. Review of Labels – Review installed labels on cables, equipment, controls, and terminal strips.
J. Review of Heat Dissipation – Survey temperatures of each piece of equipment after 4 hours use
(minimum). Note any hot equipment.
3.5 SUPPORT DURING OWNER’S FIRST USE OF COMPLETED SYSTEM
A. Provide personnel familiar with design, installation, and operation of the system to be present at Owner’s
first use of the completed system (up to 8 hours in a single session). During first use, respond to Owner
requests for troubleshooting, adjustments, and additional training. If no one contractor employee or
representative can provide expertise in all aspects of the system, provide multiple personnel for the 4
hours as required. Schedule presence of personnel in advance with Owner. Should significant
elements of the new system be operational prior to final completion, Owner may elect to schedule
contractor presence for church function prior to final completion of system. Should Owner exercise this
option, contractor presence will not be required at first use following final completion.
END OF SECTION 11738